New 3-Phase Power, Humidification & Machine Supply Installation – UK Paper Factory
Home
New 3-Phase Power, Humidification & Machine Supply Installation – UK Paper Factory













Ranger Electrical Services has delivered a brand-new power and humidification package—plus a dedicated machine supply—for a UK paper factory:
✅ 3-phase submain feeding a dedicated distribution board
✅ 8 high-pressure adiabatic humidifiers fully commissioned
✅ New machine supply installed and tested for the latest production line
✅ High-level tray work & precision cabling across the roof space
✅ Completed safely, on schedule, with zero downtime
Result: steady humidity, reliable power, and capacity for future growth—all engineered for uninterrupted production.