Following our initial installation on the main-stand side, we’ve now finished Phase 2, upgrading the pitch-side power boxes on the opposite touchline to the same specification.
- What Phase 2 delivered Identical 63 A and 32 A twin outlets to balance high- and medium-load equipment
- Heavy-duty, weather-proof stainless-steel housings built to Premier-League standards
- RCD-protected circuits for maximum safety and full compliance
- Installed, tested and commissioned between fixtures to keep the event schedule undisrupted
- With both touchlines now running on the same high-performance electrical backbone, the stadium is ready for any match-day or special-event demand.